Office relocation checklist

Offices fail to move on time for dull reasons: notices, broadband and building access. Treat those as the critical path and the furniture takes care of itself.

Eight weeks out

Check the lease for notice and reinstatement obligations, and book broadband and phone at the new site as soon as the lease is signed. Ask the building manager about goods-lift and loading-bay bookings.

  • Lease notice and reinstatement
  • Broadband booked
  • Lift and bay booking

Two weeks out

Assign a person to each department, label every desk and box with a number and a destination, and confirm the floor plan at the new office.

The week of the move

Back up data, remove personal belongings from drawers and confirm the arrival time of the van with the building.

After the van leaves

Walk through the old office with the landlord, take meter readings and photograph the condition. Hand back keys and update your address with suppliers.

Frequently asked questions

How long does an office move take?

It depends on the size and how prepared you are. A small team with labelled boxes can move far faster than one without.

Who should be on site?

A named contact at each end, with authority to make decisions.